Birgasha Ragasa Typhoon Apocalypse: How to use force majeure clauses to protect construction, leasing and supply contractual interests in extreme weather conditions

Overview

Recently, Super Typhoon Ragasa swept through Hong Kong and Taiwan, bringing strong winds and heavy rains, bursting of lakes and collapsing of infrastructures, causing heavy casualties and property losses. In manyIn the news footageIn addition, many construction sites were flooded, roads were washed out, shopping centres were closed and logistics were disrupted.

For Chinese doing business and investing in Australia, this is not just a distant piece of international news, but a reminder of the increasing impact of extreme weather and natural disasters on contract fulfilment, “nothing can be done about it”The design and use of clauses has become a key aspect of commercial contract risk management.

AHL Law_Birch Gaza Typhoon and Force Majeure Factors in Commercial Contracts

What is force majeure?

Force Majeure is an important concept in contract law, referring to an unforeseen, unavoidable and insurmountable objective event that makes the performance of a contract impossible or extremely difficult. In the Australian legal system, force majeure is not an automatically applicable right, but requires a contractualexpress agreementin order to take effect.


Common force majeure events include typhoons, floods, earthquakes, fires, epidemics, wars, government bans, major strikes, and supply chain disruptions.

little reminder: There is a similar concept in Australian law called “Frustration of Contract”, where a contract is rendered completely unperformable by events beyond the control of the parties. In the absence of a force majeure clause in a contract, a party may need to rely on the doctrine of frustration to argue for termination of the contract, but the legal hurdle is higher and more risky.

Three types of high-risk contracts: most vulnerable to disputes under typhoon impacts

Construction projects are highly susceptible to weather extremes. Heavy rains can lead to site shutdowns, flooding can damage foundations, and delays in transporting materials can lead to overruns.

Frequently Asked Questions:

  • Who bears the costs incurred as a result of the shutdown?
  • Does the contractor have to compensate the owner for the delay?
  • Can the programme be extended?

Lawyer Advice:

  • “Extreme weather”, “flooding”, etc. should be clearly listed in the contract as force majeure events.
  • (c) Agree on a clear mechanism for extension of the construction period, e.g. “days of suspension of work due to typhoons shall not be counted as part of the total construction period”.
  • Required Notification Obligation: The Contractor shall notify the Owner in writing within 5-7 days of the occurrence of the event, together with a report from the meteorological department and photographs of the site.

Shops, warehouses, and office buildings may be damaged in the event of heavy rain and flooding, tenants may not be able to operate, and landlords may not be able to provide normal conditions of use.

Frequently Asked Questions:

  • Will the rent still have to be paid in full?
  • Can a tenant terminate a lease if the rental property is severely damaged?
  • Does the landlord have a duty to repair?

Business Lawyer Advice:

  • Include in the lease a provision for rent abatement or suspension in the event of a disaster.
  • Clarify the time requirements for landlords to make repairs after a disaster, and give tenants the right to terminate the lease for late repairs.
  • Tenants keep photos of damage, police/insurance reports for claims or negotiations.

Supply chain disruptions are the most common knock-on effect of typhoon disasters: ports are closed, transport is halted and raw materials are in short supply.

Frequently Asked Questions:

  • Are suppliers compensated for delays in delivery?
  • Can the buyer rescind the contract or claim a substitute?
  • Can prices be renegotiated as a result of disaster increases?

Lawyer Advice:

  • Set out in the contract delivery delays, price adjustments, and contract termination conditions under force majeure events.
  • Required supporting documents (port notices, logistics company notices, government notices).
  • A “partial performance” is agreed upon: if the disaster affects part of the order, the unaffected part shall continue to be performed.

Key elements of a force majeure clause

key constituent instructions Practical advice
Scope of the incident
Clearly list the events covered, e.g. typhoons, floods, earthquakes, epidemics, government bans, etc.
Try to be as specific and predictable as possible and avoid over-generalisation
Notification obligations
Requirement to notify the other party within a few days of the occurrence of the incident
Recommendation 5-10 working days written notice
certification requirement
Parties are required to provide proof of the event and its impact on performance
With weather reports, site photos, official announcements
relief measure
Provides for measures that may be taken: extension of performance, relief from liability, termination of contract
Conditions for termination are clearly written to avoid abuse
Resumption of obligations
The fulfilment of the mandate should be resumed as soon as possible after the conclusion of the incident
A performance recovery plan may be requested

Example clause snippet:
“In the event that the contract cannot be performed due to a typhoon, flood or other natural disaster, the affected party shall notify the other party in writing within seven (7) days of the event and provide official weather reports. The period of performance will be automatically extended until the effects of the force majeure event are eliminated.”

 

Practical checklist: what to do immediately in the event of a disaster?

  1. Recording the site: Photographs and videos are taken and date and time information is retained.
  2. Gathering of evidence: Meteorological reports, government notices, proof of logistics stoppages
  3. written notice: Timely written notice to the other party as required by the contract
  4. Record-keeping: Email, SMS, phone records
  5. Consult a lawyer: Assess compliance with force majeure conditions to avoid loss of immunity due to procedural flaws

Case study: contract dispute under Typhoon Ragasa

Suppose a builder in Australia signs a multinational works contract for a site located in South East Asia and Typhoon Ragasa stops work on the site for a month.

  1. If the contract has a force majeure clause: the builder can apply for an extension of the work period and be exempted from late penalties.
  2. If the contract does not have a force majeure clause: the owner is likely to assert a breach of contract claim and the builder will need to rely on the doctrine of frustration of contract, with the risk of losing the claim.

This type of case shows that it is essential to have a lawyer review the contract and improve the force majeure clause in advance.

AHL Legal Business Law Solicitor Advice

Typhoon Ragasa was a wake-up call to reality. Whether it's construction work, commercial leases or supply chain contracts, extreme weather is having an increasing impact on contract performance.Planning ahead for force majeure clauses, acting quickly after the event, and retaining evidence properlyIn order to maximise the protection of your rights and interests.

If you are concerned about poor contract terms or are currently facing a contractual dispute due to extreme weather.Welcome to contact AHL Legal Team of commercial law solicitors. We can offer you:

  • Contract drafting and review
  • Compliance risk assessment under the impact of disasters
  • Negotiation and mediation with counterparties to contracts
  • Representation in litigation and arbitration where necessary
Picture of William Wong

William Wong

William Wang is the Managing Partner of AHL Legal and has over 20 years of experience in the practice of law, focusing on commercial litigation, criminal law, immigration law and family law. Formerly a solicitor at top law firm Blake Dawson Waldron (now Ashurst) and with extensive immigration practice experience at Fragomen LLC, William founded WB Legal in 2013 and will lead the merger of WB Legal with JB Solicitors in 2023, driving the firm's expansion into regional Australia and the use of legal technology. William has acted in a number of significant cases in the NSW and Federal Courts and is a well-known legal expert in the Australian Chinese community.

FAQ

What is force majeure?Ragasa Is a typhoon considered force majeure?

Force majeure refers to an unforeseen, unavoidable and insurmountable objective event that makes contract performance impossible or extremely difficult. Typhoons, floods, earthquakes, epidemics, government bans, etc. are all commonly considered force majeure events. A super typhoon such as Ragasa fully meets the criteria for force majeure, but still requires an express clause in the contract to claim an exemption.

If the contract doesn't have a force majeure clause, is it still exempt?

In Australia, it is possible to rely on the principle of Frustration of Contract to claim termination of a contract, but the threshold is high, difficult to prove and risky. It is advisable to ask your lawyer to include a force majeure clause before signing the contract to avoid being caught out at a later stage.

What do I need to do to activate the force majeure clause after a typhoon or flood?
  • Immediate documentation of the scene (photos, video, time-dated)

  • Collection of evidence (meteorological reports, government announcements, proof of logistics stoppages)

  • Timely written notice as required by the contract (usually within 5-10 working days)

  • Keeping records of correspondence (emails, SMS)

  • Consult an attorney to ensure that the process is contractually compliant and to avoid loss of exemptions

Does a force majeure clause exclude all liability?
  • Not necessarily. Force majeure clauses usually exclude liability only for delays or failures of performance caused by the event and do not automatically exclude all contractual obligations. After the event is over, a party to the contract is usually obliged to resume performance or may still be liable for breach of contract.

Who do I call to review or modify the terms of my contract?

It is advisable to seek the help of an experienced commercial lawyer, and AHL's Legal Commercial team can assist you with contract drafting, reviewing terms and conditions, dealing with disputes, and assisting you in asserting your rights and minimising your legal risks in the event of extreme weather and force majeure events.

With 30 years + local Australian practice experience, we know how to maximise your benefits within a limited timeframe.